Action Points on Webex meeting with APCs/ DEOs/PD, WDCW on 22.09.2023 at 11 A.M
Action Points on Webex meeting with APCs/ DEOs/PD, WDCW on 22.09.2023 at 11 A.M | |||
Sl.
No |
Item | Remarks | Districts |
1 |
AWCs |
1. RF requests raised by WDCW dept shall be paid through TEO transfer immediately. | ASR, Nandyala, Konaseema , Kakinada, Bapatla, Nellore, Prakasam, Eluru, Manyam, NTR, Tirupati, Anakapalli, ATP,
and Srikakulam. |
2. Phase-IIA Admin sanctions shall be completed by today evening. RF requests shall be raised by next Tuesday. | Bapatla, SPS Nellore, Krishna, ATP, VZM, ASR, NTR, Kakinada, Tirupati, Sathya Sai, Praksam, Anakapalli,
Palnadu and Chittore |
||
3. APCs shall show progress in all AWCs from one stage to next stage
in Colocated and Repairs. |
All Districts except NTR | ||
4. EAs shall take all stage photos of AWCs in new construction and
Repairs. |
All Districts | ||
2 |
Schools |
1. Admin Sanctions for Left over High Schools, SDG Schools and Missing Components shall be completed by today by evening or cancellation proposals shall be sent to Nadu-Nedu office by this
evening. |
Bapatla, Eluru, ATP, Chittore, Sathya Sai, Nellore, ASR, Praksam, Manyam, Krishna, VZM, Palnadu, EG, Tirupati, Srikakulam, Nandyal, Annamayya, NTR, VSP, WG, Kadapa |
2. Phase-IIA RF release request shall be completed by next Tuesday. |
ASR, Bapatla, Krishna, Eluru, Nellore, Sathya Sai, ATP, WG, Konaseema, Kakinada, Annamayya, Chittore, VSP, Guntur,
EG, Kurnool, Kadapa, VZM |
||
3. Phase-I money available schools list was sent to districts. Please utilize these funds to expedite the phase-II Schools and AWCs works
using the TEO option. |
All Districts |
||
4. Local purchase details entries shall be completed by Friday. | Nellore, Srikakulam, VSP, ASR, Tirupati, Kakinada, Chittore,
Sathya Sai, ATP, Annamayya, Kadapa |
||
5. At least one School per mandal for each meeting shall be Physically completed at least with out Drinking water systems and painting. if the CPM Suppliers are not responding, APCs can call MD,
APEWIDC to supply DW system and Painting. |
All Districts |
||
6. For IFPs 11th and 12th class rooms and missing 6th to 10 th classes of all Junior colleges, Social welfare, Tribal welfare, BC welfare, Residential, KGBVs and Model schools estimates shall be
submitted. |
All Districts |
||
7. Estimates for supply & fixing of IFPs for Phase-II, IIA pending 167
schools to complete today. |
All Districts | ||
8. Not started ACRs of all floors which are Independent and slabs
laid for previous floors shall be started immediately and Photos shall be captured by Monday. |
All Districts |
||
9. By October 2nd, Toilets (5400), Kitchen Sheds (3500), Repairs to Toilets (4175), Repairs to Classrooms (5215) should move to All works complete except doors fixing category and Electrical works (4710) should move to all fixtures fixed category . |
All Districts |
||
10. Invoice uploading delay at HM level, FE level and FAO level more
than 2 days shall be upload by Monday. |
Kakinada, Eluru, ASR, Annayamma, Chittore, Nellore, EG, Anakapalli, WG, Nandyal,Guntur | ||
11. For Phase-I English labs Smart TVs supplied including the accessories, Any non supplied items like sound bar shall be reported by Monday in the given Google sheet. | ASR,Anakapalli,Ananthapuram,Annamayya,Bapatla, Chittoor,EastGodavari,Eluru,Kakinada,Kurnool,Nandyal,NT R,Prakasam,Visakhapatnam,Vizianagaram,West
Godavari,YSR Kadapa |