CCS.Ref.No.PDS.II(4)/2023/1/2022 dated: 30/09/2022
Sub:-
C.S. Dept. – Implementation of delivery of ration at the door step of the Anganwadi
Centers under Integrated Child Development Services scheme and Schools covered under
Jagannana Gorumudda Scheme (formerly
Mid Day Meals (MDM) Scheme)
through Mobile Dispensing Units from October,
2022 – Instructions – Issued
– Reg.
Government
of Andhra Pradesh with a view to realize the true spirit of the National Food Security Act, 2013 and to
ensure that the entitlements under Targeted Public Distribution System (TPDS) reach all beneficiaries and to curb the malpractices, leakages, diversions in
Public Distribution System (PDS), implementing
the delivery of Rice and other scheduled commodities at the doorstep of the Rice card holders through Mobile Dispensing Units (MDUs) from February,2021.
The
Hon’ble Chief Minister, Govt. of Andhra Pradesh has instructed to supply the rice and other commodities at the door
step of the Anganwadi Centers (AWCs) under
Integrated Child Development Services scheme (ICDS) and rice to the Schools covered under Jagannana Gorumudda Scheme
(formerly Mid Day Meals (MDM) Scheme) through Mobile Dispensing Units (MDUs) from October, 2022.
Therefore,
orders are hereby issued extending the last mile delivery from fair price shops to mobile dispensing units, to
supply rice and other commodities at the door
step of the Anganwadi Centers (AWCs) under Integrated Child Development Services
scheme (ICDS) and rice to the Schools
covered under Jagannana
Gorumudda Scheme (formerly
Mid Day Meals (MDM) Scheme)
through Mobile Dispensing Units (MDUs) from October,
2022, on par with PDS by obtaining from the FP
shops. The MDU operators shall receive the stocks from the FP Shop dealers under MDM and ICDS with authentication in ePoS on par with PDS commodities and deliver the stocks to the worker
in AWCs of ICDS and incharge of School covered
under MDM.
The State Informatics Officer,
National Informatics Centre, Vijayawada is requested to ensure the following :
make necessary
modifications required in the ePoS device on adding of new
stride of door delivery
distribution through MDUs under ICDS and MDM, in addition
to existing mode of distribution.
Map the MDU operator
details with the FP Shop under ICDS and MDM.
Enable an authentication provision
in ePoS for receive of stocks by the MDU
operator from the FP Shop separately under ICDS and MDM.
Enable a separate authentication provision in ePoS for release
of stocks by the MDU operator to the Incharge
of AWCs under ICDS and Head Masters/incharges of schools covered
under MDM.
Enable
separate reports in the SCM / ePoS indicating the (i) District-wise allocation, (ii) stocks received by the
MDU operator, (iii) balance stocks to be received
by the MDU operator, (iv) stocks released to the AWCs and Schools and (v) balance
to be issued, stocks returned to the F.P. Shop dealer.
Make
a provision in ePoS for return of stocks by the MDU operator to the FP Shop under ICDS and MDM if any.
A flow chart shall be prepared
on adding of new stride of door delivery distribution through MDUs with authentication by the MDU operator, Incharge
of AWCs of ICDS and Head Masters (or) already mapped nominee of schools under MDM through, for communication to
all the concerned.
Ensure that the helpline
team of NIC with contact
number 040-23494822,
Hyderabad shall be proactive
in addressing the issues / complaints received
if any received
from the districts on mapping, authentication errors etc.
All the Collectors (CS) are requested
to ensure the following instructions scrupulously so as to roll out the door delivery of commodities
under ICDS and MDM from 1st October, 2022.
Conduct
a Mandal level meeting with the FP Shop dealers, MDU operators, Child Development Project
Officers (CDPOs), Head Masters of Schools
covered under
MDM and draw up an action plan of
route map.
The
Incharges of AWCs of ICDS and Head Masters of Schools under MDM and the MDU operators shall be in
coordination with each other, during the delivery of ration.
The MDU operators shall supply the stocks at the door step of AWCs of ICDS and Head Masters
of Schools under MDM with authentication. Manual
releases
of stocks shall not be entertained at any level. Action shall be initiated against
the MDU operator, in case of
manual supply for any
reason.
The quantity
allotted to each AWC of ICDS and Schools under
MDM is
minimal, ensure
to distribute the stocks in one-go by the MDU operator and not allowed
phase-wise / partly distribution of stocks.
The concerned
VRO shall accompany
with the MDU in the 1st month to guide and monitor the door
delivery of commodities under ICDS and MDM.
The
existing procedure on release of stocks to the Akshayapatra foundation directly through MLS points with regard to
(78) AWCs of I.C.D.S, Gudiwada, Krishna district
and (134) AWCs of I.C.D.S, Ongole (Urban) Prakasam districts shall remains same.
The
Director, Women Development & Child Welfare Department, Guntur is requested
to issue necessary
instructions to the Project Directors
/ CDPOs / Incharges of AWCs to
coordinate with the Mandal Level Stockiest Points Incharges for generation of e-Release Orders and FP
Shop dealers and MDU operators for release of stocks at the doorstep
of the AWCs through MDU with ePoS authentication only.
The Director
of MDM, School Education Dept., is requested
to issue necessary instructions to the implementing
agencies / Head Masters of Schools covered
under MDM to coordinate with the FP Shop dealers and MDU operators for release of stocks at the doorstep of the
Schools under MDM through MDU with ePoS authentication only.
Separate instructions will be issued on budgetary
involvements.
NMMS MODEL GUESS PAPER 03NMMS MODEL GUESS PAPER 03HOW TO ATTEMPT AP NMMS ONLINE TESTSRead… Read More
NMMS MODEL GUESS PAPER 02NMMS MODEL GUESS PAPER 02HOW TO ATTEMPT AP NMMS ONLINE TESTSRead… Read More
NMMS MODEL GUESS PAPER 01 NMMS MODEL GUESS PAPER 01 HOW TO ATTEMPT AP NMMS… Read More
NMMS MODEL GRAND TEST - 10NMMS MODEL GRAND TEST - 10HOW TO ATTEMPT AP NMMS… Read More
NMMS MODEL GRAND TEST - 9NMMS MODEL GRAND TEST - 9HOW TO ATTEMPT AP NMMS… Read More
NMMS MODEL GRAND TEST - 8NMMS MODEL GRAND TEST - 8HOW TO ATTEMPT AP NMMS… Read More
NMMS MODEL GRAND TEST - 7NMMS MODEL GRAND TEST - 7HOW TO ATTEMPT AP NMMS… Read More
NMMS MODEL GRAND TEST - 6NMMS MODEL GRAND TEST - 6HOW TO ATTEMPT AP NMMS… Read More
NMMS MODEL GRAND TEST - 5NMMS MODEL GRAND TEST - 5HOW TO ATTEMPT AP NMMS… Read More
NMMS MODEL GRAND TEST - 4NMMS MODEL GRAND TEST - 4HOW TO ATTEMPT AP NMMS… Read More